Test Automation for eConnectsâ„¢
DOI:
https://doi.org/10.17307/wsc.v1i1.207Resumen
Manual testing of systems controlled by a single eConnectâ„¢ requires weeks to complete. With the use of test automation, the time required for testing will be reduced to requiring only a few hours. Test automation is done with the use of Bash scripts. The Bash scripts that were created for test automation include moving map, cabin lights, and a system configuration editor. Some minor edits were made to the previously created Bash scripts such as DVT-Menu. The new Bash scripts are explained in high level detail. The results files from the tests are used to verify that the eConnectâ„¢ meet customer requirements. The results files are also used for traceability.
Citas
B/E Aerospace. (2017, June 5). eConnect Part Numbers. New Berlin, WI, U.S.
B/E Aerospace. (2015, February 2). Hardware Installation Manual eConnect 2.0 Product Line. New Berlin, WI, U.S.
Emteq. (2016, October 6). eCMS Aftermarket App Database ICD PRAN. New Berlin, WI, U.S.
Emteq. (2017, June 23). QII Protocol Cheat Sheet. New Berlin, Wisconsin, U.S.
Descargas
Publicado
Cómo citar
Número
Sección
Licencia
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.